Incentives
Funds are available for Small
Projects.
FUNDING
Funding is available for two projects types: Large Hard-to-Reach SOP projects
that have a 10 kW minimum project size; and Small Projects that have no
minimum project size.
|
|
Funding for 2008
|
|
Hard to Rearch - Large Projects
|
$630,000
|
|
Hard to Rearch - Small Projects
|
$180,000
|
|
Total
|
$810,000
|
FUNDING LIMITATIONS
To ensure that incentives are available for multiple projects, no project
sponsor and its affiliates may receive more than 15% of Entergy's program
budget in any funding year, less the small project set-aside.
|
|
Maximum Incentive to Project Sponsor
|
|
|
2008
|
|
Hard To Reach - Large Projects
|
$95,250
|
|
Hard To Reach - Small Projects
|
$20,000
|
|
|
($5,000 max per request)
|
-
A Project Sponsor may submit multiple applications and participate in multiple
projects, as long as the total incentive from all such projects does not
exceed the above limits.
-
These limits may be waived if Entergy requests and is granted a waiver from
the PUCT. Such a waiver would be requested if Entergy determines that these
limits prevent it from achieving its energy efficiency goal.
HOW FUNDING IS RESERVED
Funds are reserved for qualified project sponsors with approved applications
on a first-come, first-served basis.
INCENTIVE PRICING
Standard incentive prices are offered for demand savings and energy savings.
For the Hard-to-Reach customer class, incentive payments may not exceed 100%
of avoided costs.
|
|
Payment per kW Reduction
|
Payment per Annual kWh Saved
|
|
Hard-to-Reach
|
$430
|
$0.163
|
INCENTIVE PRICING LIMITATIONS
Load Factor Cap
For projects implemented under this Hard-to-Reach Standard Offer Program (HTR
SOP), there is a limit on the ratio of kWh payment to kW payment. This is to
limit incentives for projects that produce relatively little of their energy
savings during Entergy's peak summer demand period.
Maximum Payment per kW reduction
|
Example A Hard-to-Reach project consists of repairing ducts, installing
low-flow showerheads and installing water heater jackets. Based on deemed
savings, the project would result in 25 kW of summer peak demand reduction and
217,500 annual kWh savings. The unadjusted incentive payment for this project
would be: (24 x $430) + (217,500 x $0.163) = $45,772.50. The maximum allowable
incentive for this project is 25 kW multiplied by $1,495, or $37,375. This
project would be subject to the load factor cap. The Project Sponsor would
receive a $37,375 incentive payment.
|
Lighting Cap
If the fraction of a project sponsor's kW or kWh savings derived from lighting
measures exceeds 65% of the total savings, the incentive amounts paid to the
project sponsor for the lighting measures shall be reduced by an adjustment
factor. The application of these adjustment factors to kW and kWh payments
ensures that the lighting measure incentives paid shall not exceed 65% of the
total incentive payable if the project had consisted entirely of non-lighting
measures.
HOW ARE INCENTIVES PAID?
Deemed Savings - One Payment
A project that only utilizes deemed savings to calculate demand and energy
savings will receive an "Implementation Payment" that represents 100% of the
total estimated incentive payment after the project is installed, documented,
and accepted.
Measured Savings - Two Payments
After the project is installed, documented, and accepted, the project sponsor
will receive an "Implementation Payment" that represents 40% of the total
estimated incentive payment. After all measurement and verification activities
are complete, documented, and accepted, the project sponsor will receive the
"Performance Payment" based on verified savings (up to 60% of the total
estimated incentive payment).
OTHER NOTES
Under no circumstances will Entergy make a total incentive payment (i.e., the
sum of the Implementation Payment and the Performance Payment) that is more
than 100% of the total estimated incentive payment specified in the HTR SOP
Agreement. If the final M&V Report indicates that the measured savings are
less than the estimated savings, then the total incentive payment will be less
than the payment estimated in the Agreement. If the above formula results in a
negative amount, the Project Sponsor must refund that amount to Entergy within
30 days of receipt of an invoice from Entergy.
No Project Sponsor has unconditional entitlement to the HTR SOP incentive
funds.
In all cases, payment procedures and amounts specified in the HTR SOP
Agreement supercede this and any other documents.
|